Parameter Detail: ICE-14(run 3)

start date (GMT) 2009-01-23 (23)
end date (GMT) 2009-01-23 (23)
degree of supercooling 0.80
crystalization cell temperature [degC] 3.02
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -6
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 06:18:54
control time (nucleation start) 07:35:39
control time (laten heat release) 07:36:56
control time (crystalize start) 07:45:30
control time (melt start) 07:47:15
control time (melt end) 07:49:00
control duration (stabilization) 01:16:45
control duration (nucleation) 00:01:17
control duration (crystalization) 00:09:51
control duration (observation) 00:01:45
control duration (total) 00:13:21
note