Parameter Detail: ICE-14(run 5)
start date (GMT) |
2009-01-30 (30) |
end date (GMT) |
2009-01-30 (30) |
degree of supercooling |
0.80 |
crystalization cell temperature [degC] |
3.02 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-4 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
20:26:44 |
control time (nucleation start) |
21:52:10 |
control time (laten heat release) |
21:53:13 |
control time (crystalize start) |
22:02:20 |
control time (melt start) |
22:03:40 |
control time (melt end) |
22:06:40 |
control duration (stabilization) |
01:25:26 |
control duration (nucleation) |
00:01:03 |
control duration (crystalization) |
00:10:10 |
control duration (observation) |
00:01:20 |
control duration (total) |
00:14:30 |
note |
|