Parameter Detail: ICE-14(run 6)

start date (GMT) 2009-02-09 (40)
end date (GMT) 2009-02-09 (40)
degree of supercooling 0.80
crystalization cell temperature [degC] 3.02
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC]
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 06:22:20
control time (nucleation start) 07:15:40
control time (laten heat release) 07:17:32
control time (crystalize start) 07:24:35
control time (melt start) 07:26:30
control time (melt end) 07:29:38
control duration (stabilization) 00:53:20
control duration (nucleation) 00:01:52
control duration (crystalization) 00:08:55
control duration (observation) 00:01:55
control duration (total) 00:13:58
note