Parameter Detail: ICE-14(run 9)
start date (GMT) |
2009-02-17 (48) |
end date (GMT) |
2009-02-18 (49) |
degree of supercooling |
0.80 |
crystalization cell temperature [degC] |
3.02 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-0.7 |
nucleation cell temperature (post nucleation) [degC] |
0 -> -10 |
control time (stabilization start) |
20:05:20 |
control time (nucleation start) |
00:28:03 |
control time (laten heat release) |
00:28:50 |
control time (crystalize start) |
00:46:48 |
control time (melt start) |
00:50:15 |
control time (melt end) |
00:53:25 |
control duration (stabilization) |
04:22:43 |
control duration (nucleation) |
00:00:47 |
control duration (crystalization) |
00:18:45 |
control duration (observation) |
00:03:27 |
control duration (total) |
00:25:22 |