Parameter Detail: ICE-15(run 2)
start date (GMT) |
2009-01-23 (23) |
end date (GMT) |
2009-01-23 (23) |
degree of supercooling |
0.90 |
crystalization cell temperature [degC] |
2.92 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.8 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
00:49:22 |
control time (nucleation start) |
02:04:05 |
control time (laten heat release) |
02:05:30 |
control time (crystalize start) |
02:13:22 |
control time (melt start) |
02:14:27 |
control time (melt end) |
02:17:35 |
control duration (stabilization) |
01:14:43 |
control duration (nucleation) |
00:01:25 |
control duration (crystalization) |
00:09:17 |
control duration (observation) |
00:01:05 |
control duration (total) |
00:13:30 |
note |
|