Parameter Detail: ICE-15(run 6)
start date (GMT) |
2009-02-12 (43) |
end date (GMT) |
2009-02-12 (43) |
degree of supercooling |
0.90 |
crystalization cell temperature [degC] |
2.92 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-1 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
02:31:57 |
control time (nucleation start) |
03:52:29 |
control time (laten heat release) |
03:53:15 |
control time (crystalize start) |
04:06:25 |
control time (melt start) |
04:08:05 |
control time (melt end) |
04:11:20 |
control duration (stabilization) |
01:20:32 |
control duration (nucleation) |
00:00:46 |
control duration (crystalization) |
00:13:56 |
control duration (observation) |
00:01:40 |
control duration (total) |
00:18:51 |
note |
|