Parameter Detail: ICE-16(run 4)

start date (GMT) 2009-01-27 (27)
end date (GMT) 2009-01-27 (27)
degree of supercooling 1.00
crystalization cell temperature [degC] 2.82
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -7.6
nucleation cell temperature (post nucleation) [degC] 2.82
control time (stabilization start) 07:45:00
control time (nucleation start) 08:59:53
control time (laten heat release) 09:01:25
control time (crystalize start)
control time (melt start)
control time (melt end)
control duration (stabilization) 01:14:53
control duration (nucleation) 00:01:32
control duration (crystalization)
control duration (observation)
control duration (total)
note