Parameter Detail: ICE-17(run 1)

start date (GMT) 2009-01-28 (28)
end date (GMT) 2009-01-28 (28)
degree of supercooling 1.20
crystalization cell temperature [degC] 2.62
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -7.8
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 00:49:40
control time (nucleation start) 01:57:16
control time (laten heat release) 01:58:45
control time (crystalize start) 02:04:55
control time (melt start) 02:05:22
control time (melt end) 02:08:40
control duration (stabilization) 01:07:36
control duration (nucleation) 00:01:29
control duration (crystalization) 00:07:39
control duration (observation) 00:00:27
control duration (total) 00:11:24
note