Parameter Detail: ICE-17(run 2)
start date (GMT) |
2009-02-16 (47) |
end date (GMT) |
2009-02-16 (47) |
degree of supercooling |
1.20 |
crystalization cell temperature [degC] |
2.62 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
0 |
nucleation cell temperature (post nucleation) [degC] |
0 -> -10 |
control time (stabilization start) |
01:50:00 |
control time (nucleation start) |
02:41:20 |
control time (laten heat release) |
02:42:05 |
control time (crystalize start) |
02:56:40 |
control time (melt start) |
02:57:20 |
control time (melt end) |
03:00:00 |
control duration (stabilization) |
00:51:20 |
control duration (nucleation) |
00:00:45 |
control duration (crystalization) |
00:15:20 |
control duration (observation) |
00:00:40 |
control duration (total) |
00:18:40 |
note |
|