Parameter Detail: ICE-18(run 1)
start date (GMT) |
2009-02-08 (39) |
end date (GMT) |
2009-02-08 (39) |
degree of supercooling |
1.40 |
crystalization cell temperature [degC] |
2.42 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-1.9 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
22:13:14 |
control time (nucleation start) |
23:39:14 |
control time (laten heat release) |
23:40:00 |
control time (crystalize start) |
23:48:40 |
control time (melt start) |
23:48:40 |
control time (melt end) |
23:52:00 |
control duration (stabilization) |
01:26:00 |
control duration (nucleation) |
00:00:46 |
control duration (crystalization) |
00:09:26 |
control duration (observation) |
00:00:00 |
control duration (total) |
00:12:46 |
note |
|