Parameter Detail: ICE-19(run 2)
start date (GMT) |
2009-02-16 (47) |
end date (GMT) |
2009-02-16 (47) |
degree of supercooling |
1.60 |
crystalization cell temperature [degC] |
2.22 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-0.5 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
19:42:28 |
control time (nucleation start) |
21:01:38 |
control time (laten heat release) |
21:02:15 |
control time (crystalize start) |
21:10:25 |
control time (melt start) |
21:10:25 |
control time (melt end) |
21:14:00 |
control duration (stabilization) |
01:19:10 |
control duration (nucleation) |
00:00:37 |
control duration (crystalization) |
00:08:47 |
control duration (observation) |
00:00:00 |
control duration (total) |
00:12:22 |
note |
|