Parameter Detail: ICE-01(run 13)

start date (GMT) 2009-01-06 (6)
end date (GMT) 2009-01-06 (6)
degree of supercooling 0.03
crystalization cell temperature [degC] 3.79
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -7.9
nucleation cell temperature (post nucleation) [degC] 3.79 -> 3.77
control time (stabilization start) 20:08:48
control time (nucleation start) 21:41:18
control time (laten heat release) 21:42:45
control time (crystalize start) 21:59:39
control time (melt start) 22:37:19
control time (melt end) 22:39:40
control duration (stabilization) 01:32:30
control duration (nucleation) 00:01:27
control duration (crystalization) 00:18:21
control duration (observation) 00:37:40
control duration (total) 00:58:22