Parameter Detail: ICE-22(run 2)
start date (GMT) |
2008-12-16 (351) |
end date (GMT) |
2008-12-16 (351) |
degree of supercooling |
0.04 |
crystalization cell temperature [degC] |
3.78 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.2 |
nucleation cell temperature (post nucleation) [degC] |
0 -> 3.78 |
control time (stabilization start) |
03:48:53 |
control time (nucleation start) |
05:24:08 |
control time (laten heat release) |
05:25:00 |
control time (crystalize start) |
06:16:51 |
control time (melt start) |
07:24:55 |
control time (melt end) |
07:27:00 |
control duration (stabilization) |
01:35:15 |
control duration (nucleation) |
00:00:52 |
control duration (crystalization) |
00:52:43 |
control duration (observation) |
01:08:04 |
control duration (total) |
02:02:52 |
note |
|