Parameter Detail: ICE-22(run 3)
start date (GMT) |
2008-12-16 (351) |
end date (GMT) |
2008-12-16 (351) |
degree of supercooling |
0.04 |
crystalization cell temperature [degC] |
3.78 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8.7 |
nucleation cell temperature (post nucleation) [degC] |
3.78 |
control time (stabilization start) |
19:09:15 |
control time (nucleation start) |
20:10:08 |
control time (laten heat release) |
20:11:40 |
control time (crystalize start) |
20:32:00 |
control time (melt start) |
21:09:30 |
control time (melt end) |
21:12:08 |
control duration (stabilization) |
01:00:53 |
control duration (nucleation) |
00:01:32 |
control duration (crystalization) |
00:21:52 |
control duration (observation) |
00:37:30 |
control duration (total) |
01:02:00 |
note |
|