Parameter Detail: ICE-22(run 7)
start date (GMT) |
2009-01-21 (21) |
end date (GMT) |
2009-01-21 (21) |
degree of supercooling |
0.04 |
crystalization cell temperature [degC] |
3.78 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.8 |
nucleation cell temperature (post nucleation) [degC] |
3.78 |
control time (stabilization start) |
02:03:46 |
control time (nucleation start) |
02:55:23 |
control time (laten heat release) |
02:56:52 |
control time (crystalize start) |
03:34:11 |
control time (melt start) |
04:41:00 |
control time (melt end) |
04:43:19 |
control duration (stabilization) |
00:51:37 |
control duration (nucleation) |
00:01:29 |
control duration (crystalization) |
00:38:48 |
control duration (observation) |
01:06:49 |
control duration (total) |
01:47:56 |
note |
|