Parameter Detail: ICE-03(run 1)

start date (GMT) 2008-12-10 (345)
end date (GMT) 2008-12-10 (345)
degree of supercooling 0.06
crystalization cell temperature [degC] 3.76
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -9.1
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 20:41:13
control time (nucleation start) 22:18:10
control time (laten heat release) 22:19:50
control time (crystalize start) 22:49:15
control time (melt start) 23:07:00
control time (melt end) 23:09:30
control duration (stabilization) 01:36:57
control duration (nucleation) 00:01:40
control duration (crystalization) 00:31:05
control duration (observation) 00:17:45
control duration (total) 00:51:20
note