Parameter Detail: ICE-03(run 5)
start date (GMT) |
2009-01-20 (20) |
end date (GMT) |
2009-01-20 (20) |
degree of supercooling |
0.06 |
crystalization cell temperature [degC] |
3.76 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.2 |
nucleation cell temperature (post nucleation) [degC] |
3.76 |
control time (stabilization start) |
01:20:10 |
control time (nucleation start) |
02:19:13 |
control time (laten heat release) |
02:20:45 |
control time (crystalize start) |
02:34:45 |
control time (melt start) |
03:12:00 |
control time (melt end) |
03:14:40 |
control duration (stabilization) |
00:59:03 |
control duration (nucleation) |
00:01:32 |
control duration (crystalization) |
00:15:32 |
control duration (observation) |
00:37:15 |
control duration (total) |
00:55:27 |
note |
|