Parameter Detail: ICE-03(run 6)
start date (GMT) |
2009-02-12 (43) |
end date (GMT) |
2009-02-12 (43) |
degree of supercooling |
0.06 |
crystalization cell temperature [degC] |
3.76 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
0 |
nucleation cell temperature (post nucleation) [degC] |
3.76 |
control time (stabilization start) |
04:15:57 |
control time (nucleation start) |
05:26:18 |
control time (laten heat release) |
05:27:00 |
control time (crystalize start) |
05:41:30 |
control time (melt start) |
06:16:00 |
control time (melt end) |
06:17:00 |
control duration (stabilization) |
01:10:21 |
control duration (nucleation) |
00:00:42 |
control duration (crystalization) |
00:15:12 |
control duration (observation) |
00:34:30 |
control duration (total) |
00:50:42 |
note |
|