Parameter Detail: ICE-03(run 6)

start date (GMT) 2009-02-12 (43)
end date (GMT) 2009-02-12 (43)
degree of supercooling 0.06
crystalization cell temperature [degC] 3.76
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] 0
nucleation cell temperature (post nucleation) [degC] 3.76
control time (stabilization start) 04:15:57
control time (nucleation start) 05:26:18
control time (laten heat release) 05:27:00
control time (crystalize start) 05:41:30
control time (melt start) 06:16:00
control time (melt end) 06:17:00
control duration (stabilization) 01:10:21
control duration (nucleation) 00:00:42
control duration (crystalization) 00:15:12
control duration (observation) 00:34:30
control duration (total) 00:50:42