Parameter Detail: ICE-03(run 7)
start date (GMT) |
2009-02-13 (44) |
end date (GMT) |
2009-02-13 (44) |
degree of supercooling |
0.06 |
crystalization cell temperature [degC] |
3.76 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
0 |
nucleation cell temperature (post nucleation) [degC] |
3.76 |
control time (stabilization start) |
01:16:43 |
control time (nucleation start) |
02:52:29 |
control time (laten heat release) |
02:53:00 |
control time (crystalize start) |
03:09:38 |
control time (melt start) |
03:44:33 |
control time (melt end) |
03:47:05 |
control duration (stabilization) |
01:35:46 |
control duration (nucleation) |
00:00:31 |
control duration (crystalization) |
00:17:09 |
control duration (observation) |
00:34:55 |
control duration (total) |
00:54:36 |
note |
|