Parameter Detail: ICE-04(run 6)
start date (GMT) |
2009-01-11 (11) |
end date (GMT) |
2009-01-11 (11) |
degree of supercooling |
0.07 |
crystalization cell temperature [degC] |
3.75 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8 |
nucleation cell temperature (post nucleation) [degC] |
3.75 |
control time (stabilization start) |
20:06:53 |
control time (nucleation start) |
21:23:07 |
control time (laten heat release) |
21:24:45 |
control time (crystalize start) |
21:38:18 |
control time (melt start) |
22:19:45 |
control time (melt end) |
22:22:30 |
control duration (stabilization) |
01:16:14 |
control duration (nucleation) |
00:01:38 |
control duration (crystalization) |
00:15:11 |
control duration (observation) |
00:41:27 |
control duration (total) |
00:59:23 |
note |
|