Parameter Detail: ICE-04(run 6)

start date (GMT) 2009-01-11 (11)
end date (GMT) 2009-01-11 (11)
degree of supercooling 0.07
crystalization cell temperature [degC] 3.75
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -8
nucleation cell temperature (post nucleation) [degC] 3.75
control time (stabilization start) 20:06:53
control time (nucleation start) 21:23:07
control time (laten heat release) 21:24:45
control time (crystalize start) 21:38:18
control time (melt start) 22:19:45
control time (melt end) 22:22:30
control duration (stabilization) 01:16:14
control duration (nucleation) 00:01:38
control duration (crystalization) 00:15:11
control duration (observation) 00:41:27
control duration (total) 00:59:23
note