Parameter Detail: ICE-04(run 9)
start date (GMT) |
2009-02-18 (49) |
end date (GMT) |
2009-02-18 (49) |
degree of supercooling |
0.07 |
crystalization cell temperature [degC] |
3.75 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-1.3 |
nucleation cell temperature (post nucleation) [degC] |
3.75 |
control time (stabilization start) |
01:03:27 |
control time (nucleation start) |
01:56:21 |
control time (laten heat release) |
01:57:11 |
control time (crystalize start) |
02:08:10 |
control time (melt start) |
|
control time (melt end) |
|
control duration (stabilization) |
00:52:54 |
control duration (nucleation) |
00:00:50 |
control duration (crystalization) |
00:11:49 |
control duration (observation) |
|
control duration (total) |
|
note |
|