Parameter Detail: ICE-05(run 5)
start date (GMT) |
2009-01-19 (19) |
end date (GMT) |
2009-01-19 (19) |
degree of supercooling |
0.08 |
crystalization cell temperature [degC] |
3.74 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.1 |
nucleation cell temperature (post nucleation) [degC] |
3.74 |
control time (stabilization start) |
02:56:28 |
control time (nucleation start) |
04:10:36 |
control time (laten heat release) |
04:12:10 |
control time (crystalize start) |
04:20:51 |
control time (melt start) |
04:34:45 |
control time (melt end) |
04:37:01 |
control duration (stabilization) |
01:14:08 |
control duration (nucleation) |
00:01:34 |
control duration (crystalization) |
00:10:15 |
control duration (observation) |
00:13:54 |
control duration (total) |
00:26:25 |
note |
|