Parameter Detail: ICE-06(run 3)
start date (GMT) |
2009-01-14 (14) |
end date (GMT) |
2009-01-14 (14) |
degree of supercooling |
0.09 |
crystalization cell temperature [degC] |
3.73 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.8 |
nucleation cell temperature (post nucleation) [degC] |
3.73 |
control time (stabilization start) |
03:08:08 |
control time (nucleation start) |
04:19:28 |
control time (laten heat release) |
04:21:05 |
control time (crystalize start) |
04:31:10 |
control time (melt start) |
04:51:46 |
control time (melt end) |
04:55:00 |
control duration (stabilization) |
01:11:20 |
control duration (nucleation) |
00:01:37 |
control duration (crystalization) |
00:11:42 |
control duration (observation) |
00:20:36 |
control duration (total) |
00:35:32 |
note |
|