Parameter Detail: ICE-06(run 3)

start date (GMT) 2009-01-14 (14)
end date (GMT) 2009-01-14 (14)
degree of supercooling 0.09
crystalization cell temperature [degC] 3.73
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -7.8
nucleation cell temperature (post nucleation) [degC] 3.73
control time (stabilization start) 03:08:08
control time (nucleation start) 04:19:28
control time (laten heat release) 04:21:05
control time (crystalize start) 04:31:10
control time (melt start) 04:51:46
control time (melt end) 04:55:00
control duration (stabilization) 01:11:20
control duration (nucleation) 00:01:37
control duration (crystalization) 00:11:42
control duration (observation) 00:20:36
control duration (total) 00:35:32
note