Parameter Detail: ICE-06(run 5)
start date (GMT) |
2009-02-16 (47) |
end date (GMT) |
2009-02-16 (47) |
degree of supercooling |
0.09 |
crystalization cell temperature [degC] |
3.73 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-2 |
nucleation cell temperature (post nucleation) [degC] |
3.73 |
control time (stabilization start) |
03:25:00 |
control time (nucleation start) |
04:26:09 |
control time (laten heat release) |
04:27:00 |
control time (crystalize start) |
04:57:45 |
control time (melt start) |
05:15:00 |
control time (melt end) |
05:18:00 |
control duration (stabilization) |
01:01:09 |
control duration (nucleation) |
00:00:51 |
control duration (crystalization) |
00:31:36 |
control duration (observation) |
00:17:15 |
control duration (total) |
00:51:51 |
note |
|