Parameter Detail: ICE-07(run 3)
start date (GMT) |
2009-01-15 (15) |
end date (GMT) |
2009-01-15 (15) |
degree of supercooling |
0.10 |
crystalization cell temperature [degC] |
3.72 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-9.5 |
nucleation cell temperature (post nucleation) [degC] |
3.72 |
control time (stabilization start) |
19:22:35 |
control time (nucleation start) |
21:00:10 |
control time (laten heat release) |
21:02:00 |
control time (crystalize start) |
|
control time (melt start) |
|
control time (melt end) |
22:41:13 |
control duration (stabilization) |
01:37:35 |
control duration (nucleation) |
00:01:50 |
control duration (crystalization) |
|
control duration (observation) |
|
control duration (total) |
01:41:03 |
note |
|