Parameter Detail: ICE-07(run 4)

start date (GMT) 2009-01-16 (16)
end date (GMT) 2009-01-16 (16)
degree of supercooling 0.10
crystalization cell temperature [degC] 3.72
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC]
nucleation cell temperature (post nucleation) [degC]
control time (stabilization start) 02:30:38
control time (nucleation start) 02:50:44
control time (laten heat release)
control time (crystalize start) 02:59:25
control time (melt start) 03:13:26
control time (melt end) 03:15:00
control duration (stabilization) 00:20:06
control duration (nucleation)
control duration (crystalization) 00:08:41
control duration (observation) 00:14:01
control duration (total) 00:24:16
note