Parameter Detail: ICE-08(run 3)
start date (GMT) |
2009-01-19 (19) |
end date (GMT) |
2009-01-19 (19) |
degree of supercooling |
0.20 |
crystalization cell temperature [degC] |
3.62 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.6 |
nucleation cell temperature (post nucleation) [degC] |
3.62 |
control time (stabilization start) |
04:57:37 |
control time (nucleation start) |
05:42:23 |
control time (laten heat release) |
05:44:01 |
control time (crystalize start) |
05:48:07 |
control time (melt start) |
05:58:09 |
control time (melt end) |
06:01:00 |
control duration (stabilization) |
00:44:46 |
control duration (nucleation) |
00:01:38 |
control duration (crystalization) |
00:05:44 |
control duration (observation) |
00:10:02 |
control duration (total) |
00:18:37 |
note |
|