Parameter Detail: ICE-09(run 3)
start date (GMT) |
2009-01-15 (15) |
end date (GMT) |
2009-01-16 (16) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7 |
nucleation cell temperature (post nucleation) [degC] |
3.52 |
control time (stabilization start) |
23:15:10 |
control time (nucleation start) |
00:20:10 |
control time (laten heat release) |
00:21:40 |
control time (crystalize start) |
|
control time (melt start) |
|
control time (melt end) |
|
control duration (stabilization) |
01:05:00 |
control duration (nucleation) |
00:01:30 |
control duration (crystalization) |
|
control duration (observation) |
|
control duration (total) |
|
note |
|