Parameter Detail: ICE-09(run 4)
start date (GMT) |
2009-01-16 (16) |
end date (GMT) |
2009-01-16 (16) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-9 |
nucleation cell temperature (post nucleation) [degC] |
3.52 |
control time (stabilization start) |
04:07:33 |
control time (nucleation start) |
05:07:15 |
control time (laten heat release) |
05:09:15 |
control time (crystalize start) |
05:11:23 |
control time (melt start) |
05:16:51 |
control time (melt end) |
05:19:58 |
control duration (stabilization) |
00:59:42 |
control duration (nucleation) |
00:02:00 |
control duration (crystalization) |
00:04:08 |
control duration (observation) |
00:05:28 |
control duration (total) |
00:12:43 |
note |
|