Parameter Detail: ICE-09(run 5)
start date (GMT) |
2009-01-20 (20) |
end date (GMT) |
2009-01-20 (20) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
0 |
nucleation cell temperature (post nucleation) [degC] |
3.52 |
control time (stabilization start) |
19:39:57 |
control time (nucleation start) |
21:00:47 |
control time (laten heat release) |
21:01:00 |
control time (crystalize start) |
21:04:58 |
control time (melt start) |
21:09:36 |
control time (melt end) |
21:12:22 |
control duration (stabilization) |
01:20:50 |
control duration (nucleation) |
00:00:13 |
control duration (crystalization) |
00:04:11 |
control duration (observation) |
00:04:38 |
control duration (total) |
00:11:35 |
note |
|