Parameter Detail: ICE-09(run 6)
start date (GMT) |
2009-01-21 (21) |
end date (GMT) |
2009-01-21 (21) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
21:22:20 |
control time (nucleation start) |
22:39:10 |
control time (laten heat release) |
22:40:20 |
control time (crystalize start) |
22:51:00 |
control time (melt start) |
22:56:55 |
control time (melt end) |
22:58:30 |
control duration (stabilization) |
01:16:50 |
control duration (nucleation) |
00:01:10 |
control duration (crystalization) |
00:11:50 |
control duration (observation) |
00:05:55 |
control duration (total) |
00:19:20 |
note |
|