Parameter Detail: ICE-09(run 7)
start date (GMT) |
2009-02-08 (39) |
end date (GMT) |
2009-02-08 (39) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-1 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
20:03:08 |
control time (nucleation start) |
21:26:47 |
control time (laten heat release) |
21:27:05 |
control time (crystalize start) |
21:54:00 |
control time (melt start) |
22:00:25 |
control time (melt end) |
22:03:20 |
control duration (stabilization) |
01:23:39 |
control duration (nucleation) |
00:00:18 |
control duration (crystalization) |
00:27:13 |
control duration (observation) |
00:06:25 |
control duration (total) |
00:36:33 |
note |
|