Parameter Detail: ICE-09(run 7)

start date (GMT) 2009-02-08 (39)
end date (GMT) 2009-02-08 (39)
degree of supercooling 0.30
crystalization cell temperature [degC] 3.52
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -1
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 20:03:08
control time (nucleation start) 21:26:47
control time (laten heat release) 21:27:05
control time (crystalize start) 21:54:00
control time (melt start) 22:00:25
control time (melt end) 22:03:20
control duration (stabilization) 01:23:39
control duration (nucleation) 00:00:18
control duration (crystalization) 00:27:13
control duration (observation) 00:06:25
control duration (total) 00:36:33
note