Parameter Detail: ICE-09(run 10)

start date (GMT) 2009-02-17 (48)
end date (GMT) 2009-02-17 (48)
degree of supercooling 0.30
crystalization cell temperature [degC] 3.52
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -7.1
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 02:25:27
control time (nucleation start) 03:43:49
control time (laten heat release) 03:45:10
control time (crystalize start) 03:55:20
control time (melt start) 05:45:00
control time (melt end) 05:47:00
control duration (stabilization) 01:18:22
control duration (nucleation) 00:01:21
control duration (crystalization) 00:11:31
control duration (observation) 01:49:40
control duration (total) 02:03:11
note