Parameter Detail: ICE-09(run 10)
start date (GMT) |
2009-02-17 (48) |
end date (GMT) |
2009-02-17 (48) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.1 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
02:25:27 |
control time (nucleation start) |
03:43:49 |
control time (laten heat release) |
03:45:10 |
control time (crystalize start) |
03:55:20 |
control time (melt start) |
05:45:00 |
control time (melt end) |
05:47:00 |
control duration (stabilization) |
01:18:22 |
control duration (nucleation) |
00:01:21 |
control duration (crystalization) |
00:11:31 |
control duration (observation) |
01:49:40 |
control duration (total) |
02:03:11 |
note |
|