Parameter Detail: ICE-10(run 3)
start date (GMT) |
2009-01-18 (18) |
end date (GMT) |
2009-01-19 (19) |
degree of supercooling |
0.40 |
crystalization cell temperature [degC] |
3.42 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-10 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
22:44:02 |
control time (nucleation start) |
00:17:31 |
control time (laten heat release) |
00:19:48 |
control time (crystalize start) |
00:21:45 |
control time (melt start) |
00:24:38 |
control time (melt end) |
00:27:25 |
control duration (stabilization) |
01:33:29 |
control duration (nucleation) |
00:02:17 |
control duration (crystalization) |
00:04:14 |
control duration (observation) |
00:02:53 |
control duration (total) |
00:09:54 |
note |
|