Parameter Detail: ICE-10(run 3)

start date (GMT) 2009-01-18 (18)
end date (GMT) 2009-01-19 (19)
degree of supercooling 0.40
crystalization cell temperature [degC] 3.42
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -10
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 22:44:02
control time (nucleation start) 00:17:31
control time (laten heat release) 00:19:48
control time (crystalize start) 00:21:45
control time (melt start) 00:24:38
control time (melt end) 00:27:25
control duration (stabilization) 01:33:29
control duration (nucleation) 00:02:17
control duration (crystalization) 00:04:14
control duration (observation) 00:02:53
control duration (total) 00:09:54
note