Parameter Detail: ICE-10(run 7)
start date (GMT) |
2009-02-15 (46) |
end date (GMT) |
2009-02-15 (46) |
degree of supercooling |
0.40 |
crystalization cell temperature [degC] |
3.42 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
18 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
20:18:26 |
control time (nucleation start) |
22:17:24 |
control time (laten heat release) |
22:18:05 |
control time (crystalize start) |
|
control time (melt start) |
22:38:00 |
control time (melt end) |
22:38:00 |
control duration (stabilization) |
01:58:58 |
control duration (nucleation) |
00:00:41 |
control duration (crystalization) |
|
control duration (observation) |
|
control duration (total) |
00:20:36 |
note |
|