Parameter Detail: ICE-11(run 3)
start date (GMT) |
2009-01-05 (5) |
end date (GMT) |
2009-01-05 (5) |
degree of supercooling |
0.50 |
crystalization cell temperature [degC] |
3.32 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-12.5 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
20:18:00 |
control time (nucleation start) |
21:18:55 |
control time (laten heat release) |
21:30:50 |
control time (crystalize start) |
21:31:05 |
control time (melt start) |
21:34:30 |
control time (melt end) |
21:38:04 |
control duration (stabilization) |
01:00:55 |
control duration (nucleation) |
00:11:55 |
control duration (crystalization) |
00:12:10 |
control duration (observation) |
00:03:25 |
control duration (total) |
00:19:09 |
note |
|