Parameter Detail: ICE-12(run 3)
start date (GMT) |
2009-01-21 (21) |
end date (GMT) |
2009-01-21 (21) |
degree of supercooling |
0.60 |
crystalization cell temperature [degC] |
3.22 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-5.2 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
19:53:18 |
control time (nucleation start) |
20:55:20 |
control time (laten heat release) |
20:56:20 |
control time (crystalize start) |
21:05:45 |
control time (melt start) |
21:09:00 |
control time (melt end) |
21:12:10 |
control duration (stabilization) |
01:02:02 |
control duration (nucleation) |
00:01:00 |
control duration (crystalization) |
00:10:25 |
control duration (observation) |
00:03:15 |
control duration (total) |
00:16:50 |
note |
|