Parameter Detail: ICE-13(run 1)
start date (GMT) |
2008-12-05 (340) |
end date (GMT) |
2008-12-05 (340) |
degree of supercooling |
0.70 |
crystalization cell temperature [degC] |
3.12 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.4 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
01:20:00 |
control time (nucleation start) |
03:55:16 |
control time (laten heat release) |
03:56:18 |
control time (crystalize start) |
04:05:05 |
control time (melt start) |
04:08:00 |
control time (melt end) |
04:10:30 |
control duration (stabilization) |
02:35:16 |
control duration (nucleation) |
00:01:02 |
control duration (crystalization) |
00:09:49 |
control duration (observation) |
00:02:55 |
control duration (total) |
00:15:14 |
note |
|