Parameter Detail: ICE-13(run 2)
start date (GMT) |
2009-01-22 (22) |
end date (GMT) |
2009-01-22 (22) |
degree of supercooling |
0.70 |
crystalization cell temperature [degC] |
3.12 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-5.6 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
21:48:28 |
control time (nucleation start) |
22:52:47 |
control time (laten heat release) |
22:53:50 |
control time (crystalize start) |
23:03:00 |
control time (melt start) |
23:04:50 |
control time (melt end) |
23:07:55 |
control duration (stabilization) |
01:04:19 |
control duration (nucleation) |
00:01:03 |
control duration (crystalization) |
00:10:13 |
control duration (observation) |
00:01:50 |
control duration (total) |
00:15:08 |
note |
|