Parameter Detail: ICE-13(run 5)
start date (GMT) |
2009-01-28 (28) |
end date (GMT) |
2009-01-28 (28) |
degree of supercooling |
0.70 |
crystalization cell temperature [degC] |
3.12 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-3.6 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
21:54:50 |
control time (nucleation start) |
23:19:38 |
control time (laten heat release) |
23:20:28 |
control time (crystalize start) |
23:29:20 |
control time (melt start) |
23:31:07 |
control time (melt end) |
23:34:13 |
control duration (stabilization) |
01:24:48 |
control duration (nucleation) |
00:00:50 |
control duration (crystalization) |
00:09:42 |
control duration (observation) |
00:01:47 |
control duration (total) |
00:14:35 |
note |
|