Parameter Detail: DS1-01

start date (GMT) 2013-09-29 (272)
end date (GMT) 2013-09-30 (273)
team
disk diameter [mm] 30
target liquid bridge length [mm]
initial gap [mm] 0.24
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D)
typical volume ratio (V/V0)
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target functional check
note checkout operation