Parameter Detail: DS1-21

start date (GMT) 2014-01-22 (22)
end date (GMT) 2014-01-23 (23)
team
disk diameter [mm] 30
target liquid bridge length [mm] 15
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 1.01
MIDM image position from HD surface (Edge) [mm] from 0.0 to 15.2
recording status with VRU Rec.
operation target measurement of DSD
note