Parameter Detail: DS1-30

start date (GMT) 2014-02-23 (54)
end date (GMT) 2014-02-24 (55)
team
disk diameter [mm] 30
target liquid bridge length [mm] 15
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] from 0 to 16.4
recording status with VRU Rec.
operation target measurement of DSD
note