Parameter Detail: DS2-01

start date (GMT) 2014-11-30 (334)
end date (GMT) 2014-12-01 (335)
team
disk diameter [mm] 10
target liquid bridge length [mm]
initial gap [mm]
cooling disk position at the end of experiment [mm] 3
aspect ratio (L/D)
typical volume ratio (V/V0)
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target functional check
note checkout operation (cont.); misaligned IR image fieldcheckout operation;