Parameter Detail: DS2-02
start date (GMT) | 2014-12-16 (350) |
---|---|
end date (GMT) | 2014-12-17 (351) |
team | |
disk diameter [mm] | 10 |
target liquid bridge length [mm] | 5 |
initial gap [mm] | 3.00 |
cooling disk position at the end of experiment [mm] | 0 |
aspect ratio (L/D) | 0.5 |
typical volume ratio (V/V0) | 1 |
MIDM image position from HD surface (Edge) [mm] | from 0 to 4.92 |
recording status | without VRU Rec. |
operation target | critical DT, measurement of DSD |
note | fixed IR image field at Dec. 15; 22:01-23:32 air bubble removal; |