Parameter Detail: DS2-21
start date (GMT) | 2015-03-15 (74) |
---|---|
end date (GMT) | 2015-03-16 (75) |
team | |
disk diameter [mm] | 10 |
target liquid bridge length [mm] | |
initial gap [mm] | 7.00 |
cooling disk position at the end of experiment [mm] | -2 |
aspect ratio (L/D) | |
typical volume ratio (V/V0) | |
MIDM image position from HD surface (Edge) [mm] | |
recording status | without VRU Rec. |
operation target | Drying operation for Cooling Disk |
note | Experiment has been canceled by oil leak at the disk edge. |