Parameter Detail: DS2-21

start date (GMT) 2015-03-15 (74)
end date (GMT) 2015-03-16 (75)
team
disk diameter [mm] 10
target liquid bridge length [mm]
initial gap [mm] 7.00
cooling disk position at the end of experiment [mm] -2
aspect ratio (L/D)
typical volume ratio (V/V0)
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target Drying operation for Cooling Disk
note Experiment has been canceled by oil leak at the disk edge.