Parameter Detail: DS2-23

start date (GMT) 2015-03-17 (76)
end date (GMT) 2015-03-18 (77)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 5.00
cooling disk position at the end of experiment [mm] -2.5
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 0.44, 0.35
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target critical DT
note with air bubble