Parameter Detail: DS2-26

start date (GMT) 2015-03-23 (82)
end date (GMT) 2015-03-24 (83)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 7.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 0.35
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target influence of volume ration on leak (from Disk Edge) condition
note Experiment has been canceled by oil leak at the disk edge.