Parameter Detail: DS2-29

start date (GMT) 2015-04-07 (97)
end date (GMT) 2015-04-08 (98)
team
disk diameter [mm] 10
target liquid bridge length [mm] 10
initial gap [mm] 2.50
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 1
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm]
recording status without VRU Rec.
operation target influence of cooling disk temp. on critical DT
note