Parameter Detail: DS2-03
start date (GMT) | 2014-12-17 (351) |
---|---|
end date (GMT) | 2014-12-18 (352) |
team | |
disk diameter [mm] | 10 |
target liquid bridge length [mm] | 10 |
initial gap [mm] | 3.00 |
cooling disk position at the end of experiment [mm] | 2 |
aspect ratio (L/D) | 1 |
typical volume ratio (V/V0) | 1 |
MIDM image position from HD surface (Edge) [mm] | from 0 to 9.9 |
recording status | without VRU Rec. |
operation target | critical DT, measurement of DSD |
note | 22:25-00:13 air bubble removal |